Who This Is For
Operators running five or more units who suspect their electricity bills are higher than projected, or buyers comparing models where advertised efficiency differs from bench results.
What You Receive
On-site measurement of power draw at the PDU level for each miner model in your fleet. We cross-reference measured consumption against hashrate output to calculate real J/TH, then model monthly electricity cost at your contracted rate.
The audit identifies units drawing disproportionate power relative to output — often a sign of failing fans, degraded hashboards, or incorrect voltage settings.
Scope
- Half-day on-site visit within 100 km of Daegu (travel beyond quoted separately)
- Per-unit power and hashrate logging over 4 hours
- Cooling environment assessment (ambient temperature, airflow obstructions)
- Ranked comparison of units by cost-per-TH/hour
Pricing
₩620,000 for facilities with up to 30 units. Larger deployments quoted on request.